6025 EPICON T-500 High-build Epoxy Cargo Tank Coating is an epoxy coating. A single coat by airless spray can achieve a DFT of 70–160 µm. Parameters on this page: volume solids 58 ± 2% (ISO: 3233), DFT 70–160 µm, theoretical spreading rate 0.121–0.276 L/m2. Comparable products of the same brand and type: 5006 ALP 500 epoxy coating, 5055 BANNOH 500 epoxy coating, 5055D BANNOH 500 AC epoxy coating.
Parameter source: CMP original Technical Data Sheet (TDS) \"6025 EPICON T-500 High-build Epoxy Cargo Tank Coating\"; values such as spreading rate are converted from TDS parameters and are for selection reference only.
The above content is compiled from the manufacturer's datasheet and this site's parameter tables. For selection, coating systems and lead times, pleaseContact Usfor confirmation.
This page carries the full TDS for this product, translated from the manufacturer's original document. No file download is needed; for an original-language copy, send an enquiry.
| Volume Solids | 58 ± 2% (ISO: 3233) |
|---|---|
| Dry Film Thickness | 70–160 µm |
| Theoretical Spreading Rate | 0.121-0.276 L/m2 |
| VOC | 403 g/L (Method 24) |
| Density / Specific Gravity | 1.39 g/ml (ISO: 2811) |
| Number of Components | Two-component |
| Thinner | EPOXY THINNER B |
| Mixing Ratio | Base : curing agent = 78:22 (by volume) |
| Colour / Appearance | Red-brown, grey, light grey, white |
For more Q&A on selection, application, acceptance and defect diagnosis, seeFAQsection.
EPICON T-500 is a high-build epoxy coating with strong adhesion, a tough film and abrasion resistance, and high resistance to brine, fresh water, petroleum products, crude oil, alkaline substances and weak acids. Used as a protective coating for cargo tank interiors. Suitable for COT PSPC. A single coat by airless spray can achieve a DFT of 70–160 µm.
| Type | High-Build Epoxy Tank Coating |
|---|---|
| Use | Suitable as a topcoat for oil tanks, fresh water tanks, cargo holds, solvent tanks, chemical tanks and the like |
| Mixing Ratio | Base : curing agent = 78:22 (by volume) |
|---|---|
| Colour | Red-brown, grey, light grey, white |
| Flash Point | Base 17.7°C Curing agent 15.5°C |
| Density | 1.39 g/ml (ISO: 2811) |
| Volume Solids | 58 ± 2% (ISO: 3233) |
| Volatile organic compound content | 403 g/L (Method 24) |
| Theoretical spreading rate | 0.121-0.276 L/m2 |
| Thickness | WFT 121–276 µm DFT 70–160 µm |
(dry film 125 µm)
| Temperature | 5 °C | 10 °C | 20 °C | 30 °C | 40 °C | |
| Drying Time | Surface Dry | 3.5 h | 2.5 h | 1.5 h | 30 min | 15 min |
| Hard Dry | 36 h | 24 h | 12 h | 6 h | 4 h | |
| Recoat interval | At least | 36 h | 24 h 12(16) h | 6(14) h | 4(8) h | |
| At most* | 28 days | 21 days | 14 days | 10 days | ||
| At most** | 10 days | 7 days | 5 days | 3 days | ||
| Pot life | 10 h | 7 h | 5 h | 3 h | 1.5 h | |
| Induction Time | 30 min | 20 min | 10 min | |||
| Application method | Airless spray, brush, roller |
|---|---|
| Weather: temperature | Minimum 5(10)°C |
| Humidity | Maximum 85% RH; steel temperature at least 5 °C above the dew point |
| Airless spray: viscosity | 1-1.8Pa.S |
| Nozzle | Graco619,621,623 |
| Paint output pressure | 14.7-17.7 Mpa |
| Spray gun speed | 60–80 cm/s |
| Thinner | EPOXY THINNER B |
| Thinning | 0–10% by volume |
| Newbuilding | Follow the shipyard standards. Consult your CMP representative for advice. |
|---|---|
| Repair and maintenance | Remove oil and grease. Remove salts and other contaminants with high-pressure clean water, then dry |
| Fully. Remove damaged areas by abrasive blasting to at least Sa 2½ (ISO 8507-1 | 2007) or with power |
| power tools to St 3 (ISO 8507-1 | 2007). |
| Rinse with water | Consult your CMP representative for advice. |
The type and degree depend on the actual condition of the material and the required performance.
Optimum results can be achieved even on lightly corroded or damp steel surfaces.
Use standards consistent with the Worldwide Marine Specifications.
| Preceding coat | CERABOND2000, NZ PRIMER S, EPICON ZINC RICH PRIMER B-2EPICON T-500 PRIMER H |
|---|---|
| Subsequent coat | EPICON T-500 |
| Packaging | Two-component |
Note: 1. In confined spaces or restricted spaces at low temperature, ventilation is necessary to remove volatilised solvent and promote film formation during application and drying.
2. Stir the base with an electric stirrer to a uniform state, then thoroughly stir all of the curing agent with the base. Finally add an appropriate amount of thinner and mix thoroughly.
3. Excessive solvent may reduce sag resistance. 4. Mix only the amount of paint that can be used within the specified pot life.
5. *(1) Shade netting is recommended over the coating surface to avoid direct sunlight through manholes or other openings.
If the coating surface has been directly exposed to sunlight, the above “**” indicates the maximum recoat interval
| 6 *** on steel plate | Dew point + minimum 5 °C |
|---|---|
| on the film | Dew point + minimum 3°C 7 The drying times and coating intervals in parentheses above refer to cargo tank coating of liquid cargo carriers. For details refer to \"CMP Instructions for Cargo Tank Coating of Liquid Cargo Carriers\". |
8. Density, volume solids and VOC content are theoretical calculated values without thinner. Values vary with colour, production process and local regulations.
Information is subject to the manufacturer's latest version; the manufacturer's latest TDS prevails.
The technical parameters on this page are taken from the product's original manufacturer technical datasheet, the copyright of which belongs to the manufacturer. If a rights holder considers the presentation inappropriate, contact us for verification and handling.
Packaging specifications and batch lead times are subject to actual availability. PleaseContact Uscontact us for project-based calculation.