Wanzhou Second Yangtze River Bridge, Chongqing
KANSAI Paint Project Cases

Wanzhou Second Yangtze River Bridge, Chongqing

Project locationChongqing — Wanzhou
Project typeLarge suspension bridge
Coating brandKANSAI PAINT
Time2004 (construction time per the manufacturer's publication)
Disclaimer: The cases on this page are practical projects published in the coating brands' official promotional material, and the coatings were applied by the brands' own systems. The content is provided for coating application technical reference only; the cases have no supply, application or other association with RichTech Industrial Technology (Shanghai) Co., Ltd.

Project overview

The Wanzhou Yangtze River Second Bridge is an extra-large suspension bridge connecting the main urban area of Wanzhou with the Jiangnan New District, with a total length of 1148.86 m and a main span of 580 m, with four lanes in both directions, serving as a river crossing in the hinterland of the Three Gorges reservoir area. The project is included in the bridge section of COSCO Kansai's Industrial Anticorrosive Coating Project Cases.

Anti-corrosion (fire protection) challenge

  • The river surface in the reservoir area is hot and humid all year round, with moisture condensation in the winter and spring fog season; the steel structures are in a high-humidity environment for long periods;
  • The steel trusses of the suspension bridge and the main cable anchorage zones have complex shapes, with poor coating accessibility;
  • The bridge is a hundred-year project; the colour and gloss retention and long-term corrosion protection requirements of the topcoat are far higher than for ordinary municipal structures.

Coating system

AreaCoating systemsNote
Main steel structures such as steel trussesEpoxy zinc-rich primer + epoxy MIO intermediate coat + fluorocarbon topcoatKANSAI bridge fluorocarbon long-term coating system direction
Topcoat protection objectivesFluorocarbon coating with low soiling, colour and gloss retentionSuited to the bridge landscape and long service life requirements

*The table lists the coating systems or system directions recorded in the manufacturer's documentation; specific models and film thicknesses are subject to the project technical documents.

Source

COSCO Kansai Industrial Anticorrosive Coating Project Cases (bridge and municipal section, page 4); public project information for the Wanzhou Yangtze River Second Bridge.

Other case studies

Related articles

Silicone Heat-Resistant Coating Solvalitt 300 Launched→General-Purpose Abrasion-Resistant Epoxy Jotamastic 95 XT Launched→

Not sure which model to choose?Tell us the application area and site conditions

Professional coating selection advisors provide one-to-one help with specifying systems, calculating quantities and quoting prices.

Contact Us
China production baseIndustrial & marine coatingsWorldwide delivery