Peng Lai 19-3 Offshore Oil Platform Project (Phases I & II)
International Project Cases

Peng Lai 19-3 Offshore Oil Platform Project (Phases I & II)

Project locationBohai Bay Block 11/05
Project typeOffshore oil platform (Phases I and II)
Coating brandInternational® (AkzoNobel)
Time2001–2007 (per the manufacturer's publication)
Disclaimer: The cases on this page are practical projects published in the coating brands' official promotional material, and the coatings were applied by the brands' own systems. The content is provided for coating application technical reference only; the cases have no supply, application or other association with RichTech Industrial Technology (Shanghai) Co., Ltd.

Project overview

Penglai 19-3 is China's largest offshore oilfield, located in the Bohai Bay at an average water depth of about 30 m. Phase I was commissioned in 2002; Phase II built five wellhead platforms tied back to a central platform, with a supporting FPSO. The project is included in the AkzoNobel brochure.

Anti-corrosion (fire protection) challenge

  • The splash zone and tidal zone alternate between wet and dry, being the harshest marine corrosion zones (C5-M / CX);
  • The platform design life is over 25 years, with extremely limited maintenance windows;
  • The topside modules include process fire zones, requiring zone-by-zone systems for corrosion protection and passive fire protection.

Coating system

AreaCoating systems (manufacturer products)Note
Jacket and topside modulesInterzinc® 52 epoxy zinc-rich + Intergard® 475HS high-build epoxy + Interthane® 990 polyurethane topcoatSystem per the manufacturer's publication
Steel structures in the process fire zonesChartek® passive fire protection coating (Chartek® 7 per the publication)Epoxy intumescent
Other functional areasInterzone® 485 and other manufacturer systemsSelected by zone

*The table lists the coating systems or system directions recorded in the manufacturer's documentation; specific models and film thicknesses are subject to the project technical documents.

Source

AkzoNobel brochure (page 5); public project information for the Penglai 19-3 oilfield.

Other case studies

Related articles

Epoxy Zinc-Rich Primer Barrier 65 S Launched→Silicone antifouling tender failed — which qualification thresholds caused it→

Not sure which model to choose?Tell us the application area and site conditions

Professional coating selection advisors provide one-to-one help with specifying systems, calculating quantities and quoting prices.