CASE — Case Studies
CNOOC DF13-2 Fixed Platform
JOTUN practical projects

CNOOC DF13-2 Fixed Platform

Project locationWestern South China Sea — Yinggehai Basin
Project typeOffshore fixed platform
Coating brandJOTUN
TimeCommissioned in 2019
Disclaimer: The cases on this page are practical projects published in the coating brands' official promotional material, and the coatings were applied by the brands' own systems. The content is provided for coating application technical reference only; the cases have no supply, application or other association with RichTech Industrial Technology (Shanghai) Co., Ltd.

Project overview

The Dongfang 13-2 gas field is located in the Yinggehai Basin in the western South China Sea, at a water depth of about 70 m, with proven reserves of about 100 billion m³. The development deploys one central platform and two wellhead platforms with 30 production wells, producing over 3 billion m³ of natural gas per year after commissioning. The project is included in JOTUN's marine engineering solutions brochure.

Anti-corrosion (fire protection) challenge

  • Construction in 70 m open sea; the jacket anticorrosive coating shall be applied once and for all at the onshore prefabrication stage;
  • High temperature, high humidity and high salt spray combined with the hydrocarbon media environment of the gas field;
  • The process area of the central platform has fire zoning requirements.

Coating system

AreaSystem directionNote
Jacket and wellhead platform structuresEpoxy zinc-rich + high-build epoxy + polyurethane topcoatTypical Coating System Directions for JOTUN Marine and Offshore
Fire zones of the process modulesEpoxy intumescent passive fire protection coatingDesigned by fire zone

*The table lists the coating systems or system directions recorded in the manufacturer's documentation; specific models and film thicknesses are subject to the project technical documents.

Source

JOTUN Anticorrosive Coating Solutions for Marine Engineering Structures (page 9); public project information for the Dongfang 13-2 gas field.

Other case studies

Related articles

Graphene Epoxy Zinc-Rich Primer Jota GPE 65 Launched→How to verify film thickness at the ship coating site? Which points should the owner's representative watch→

Not sure which model to choose?Tell us the application area and site conditions

Professional coating selection advisors provide one-to-one help with specifying systems, calculating quantities and quoting prices.

Contact Us
China production baseIndustrial & marine coatingsWorldwide delivery