Epoxy Zinc Phosphate Primer XH4018

Quick Specs

Epoxy Zinc Phosphate Primer XH4018 is an epoxy paint, used as a primer. Used as a high-performance anti-corrosive primer for corrosion protection of steel facilities and equipment in harsh environments such as petrochemical plants, chemical plants and power plants. Parameters on this page: volume solids 60 ± 2%, dry film thickness 50/80/100 µm, theoretical spreading rate 5.9 m²/L.

Parameter source: T&H manufacturer's Technical Data Sheet (TDS) "Epoxy Zinc Phosphate Primer XH4018"; spreading rate and other values are converted from the TDS parameters and provided for product selection reference only.
The above content is compiled from the manufacturer's datasheet and this site's parameter tables. For selection, coating systems and lead times, pleaseContact Usfor confirmation.

This page carries the full TDS for this product, translated from the manufacturer's original document. No file download is needed; for an original-language copy, send an enquiry.

Volume Solids60 ± 2%
Dry Film Thickness50/80/100 µm
Theoretical Spreading Rate5.9 m2/L
VOC410g/L
Density / Specific Gravity1.45 kg/L
Number of ComponentsTwo-component
Flash Point25°C
Thinner5-15%
Mixing RatioBase : curing agent = 8:1 (by weight), 82:18 (by volume)

Browse Similar Models by CategoryThis model belongs to: Primer, Epoxy

FAQ

How many components does Epoxy Zinc Phosphate Primer have?
Epoxy Zinc Phosphate Primer is a two-component product; mix according to the ratio in the "Coating Data" table on this page before use.
What is the mixing ratio of Epoxy Zinc Phosphate Primer?
The mixing ratio of Epoxy Zinc Phosphate Primer is Base : Hardener = 8:1 (by weight) 82:18 (by volume).
What is the typical dry film thickness for Epoxy Zinc Phosphate Primer?
The typical dry film thickness of Epoxy Zinc Phosphate Primer is 50/80/100 µm; the exact value depends on the coating system and design requirements.
What is the theoretical spreading rate of Epoxy Zinc Phosphate Primer?
The theoretical spreading rate of Epoxy Zinc Phosphate Primer is 5.9 m²/L; actual consumption depends on substrate roughness, application losses and colour opacity.
What is the volume solids of Epoxy Zinc Phosphate Primer?
The volume solids of Epoxy Zinc Phosphate Primer is 60 ± 2%.
What is the VOC of Epoxy Zinc Phosphate Primer?
The VOC of Epoxy Zinc Phosphate Primer is 410 g/L.
What is the gloss of Epoxy Zinc Phosphate Primer?
The gloss of Epoxy Zinc Phosphate Primer is not applicable.
What thinner is used with Epoxy Zinc Phosphate Primer?
Recommended thinner for Epoxy Zinc Phosphate Primer: 5–15%.
What is the flash point of Epoxy Zinc Phosphate Primer?
The flash point of Epoxy Zinc Phosphate Primer is 25 °C; storage, transport and application shall follow the product Safety Data Sheet.
Which standards apply to Epoxy Zinc Phosphate Primer?
As recorded in the technical data on this page: before coating, all surfaces shall be assessed and prepared in accordance with ISO 8504:2000. Specific applicability is subject to the manufacturer's technical data sheet and the coating system.
Where can Epoxy Zinc Phosphate Primer be purchased?
RichTech Industrial Technology (Shanghai) Co., Ltd. distributes industrial and marine coatings, representing brands including JOTUN, HEMPEL, International, PPG and KANSAI, and provides product selection, coating systems and quantity calculations. Company address: Changhui Building, 799 Yinxiang Road, Jiading District, Shanghai.

Product Description

A two-component high-build epoxy zinc phosphate primer. Used as a high-performance anti-corrosive primer for corrosion protection of steel facilities and equipment in harsh environments such as petrochemical plants, chemical plants and power plants.

Product Characteristics

Basic physical and chemical data

ColourIron red, grey
GlossN/A
density1.45 kg/L
Volume Solids60±2%
Volatile Organic Compounds410g/L
Flash Point25°C
Mixing ratioBase : curing agent = 8:1 (by weight), 82:18 (by volume)

Application parameters

Typical dry film thickness80µm
Recommended dry film thickness50–100 µm, depending on system requirements
Induction time (20 °C)10~15min

Application Methods

Thinner quantity (by volume)Airless spray 0–15%Air spray 5–20%Roller or brush 5–15%
Recommended nozzle size0.43~0.64mm1.5~2.5mm/
Recommended spray pressure15~20MPa0.3~0.6MPa/
Application suitabilityRecommendedApplicableFor small-area repair only

*Use a slow thinner in hot weather

Theoretical Spreading Rate

Dry film thickness (µm)5080100
Wet film thickness (µm)85136170
Theoretical spreading rate (m²/L)11.87.45.9

Application data (typical dry film thickness 80 µm)

TemperatureSurface DryHard DryPot LifeRecoat interval
MinimumMaximum*
5°C90min24h6h48h/
15°C50min16h5h24h/
25°C30min8h4h12h/
40°C20min4h2h8h/

*The maximum recoat interval depends on the exposure environment and the end use of the coating.

Surface Preparation

All surfaces to be coated shall be clean, dry and free of contaminants. Before coating, all surfaces shall be assessed and treated in accordance with ISO 8504:2000. Blast clean to Sa 2½ with a surface roughness of 40–75 µm. Before rust removal, all oil, grease and weld spatter shall be removed and welds and sharp edges ground. Where the film of this coating is mechanically damaged or shows local rusting, blast clean the affected area to Sa 2½ or power tool clean to St 3 before local repair.

Precautions

1. During application, ensure adequate ventilation and exhaust, keep away from sources of ignition, and wear protective equipment such as masks and gloves; maintain adequate ventilation also during curing. 2. Before mixing the two components, stir the base component thoroughly with a power tool, then add the hardener and mix uniformly; adjust the amount of thinner according to application needs and temperature changes, mix thoroughly, and induce for 10–15 min before application. 3. This product only develops its anti-corrosion performance when applied over blast-cleaned surfaces; low film thickness should not be applied on high-roughness surfaces, otherwise the coating cannot completely cover the substrate and the expected anti-corrosion performance will not be achieved. 4. This product is not recommended as a primer for immersed coating systems for underwater, chemical-resistant or oil-resistant applications; the zinc ions may even affect the quality of certain jet fuels. 5. If the coating chalks after long-term exposure, wash with high-pressure water or sand the surface before applying the subsequent coating. 6. The recommended film thickness per coat of this product shall not exceed 120 µm, otherwise the surface smoothness will increase and affect overcoating of subsequent coats. 7. During application and curing, the substrate temperature must be above 5 °C and at least 3 °C above the dew point, and the relative humidity must not exceed 85%. Temperature and relative humidity shall be measured on the substrate close to the work point. 8. Cutting structures coated with this coating produces fumes and dust; appropriate protection shall be used. 9. When work is interrupted, do not leave paint in the hose, spray gun or spray equipment. Flush all equipment thoroughly with thinner. If the interruption is too long, it is recommended to mix a fresh batch of paint for application. 10. All equipment shall be cleaned with thinner immediately after use. Flushing the spray equipment periodically during daily work is good practice. The cleaning frequency depends on spray volume, temperature, spraying time and interruptions. 11. Leftover paint and empty cans shall be disposed of according to local regulations.

Packaging

22.5 kg per unitBase 20 kgCuring agent 2.5 kg
15 L per unitBase 12.3 LCuring agent 2.7 L

Storage

Keep sealed in a ventilated, cool, dry place away from sources of ignition. Minimum 12 months.

Safety Precautions

1. For the coating and its recommended thinners, see the safety sheets and the safety data of the relevant materials. This is a solvent-borne coating; avoid inhaling spray mist and solvent vapours, and avoid exposing skin and eyes and contact with uncured paint as far as possible. 2. All work related to the application and use of this product must comply with the relevant national health, safety and environmental standards and regulations. 3. If welding or flame cutting is required on metal coated with this product, dust and fumes will be generated; use appropriate personal protective equipment and adequate local ventilation. 4. If in doubt about the suitability of this product, consult the company.

Scope of liability

The information provided in this product data sheet is based on laboratory test results that we consider accurate, and is provided for application guidance only. All recommendations and advice given by T&H on the use of T&H products, whether in technical documents, special consultation or otherwise, are based on information we consider most reliable. Our products and the information provided are intended for users with the necessary knowledge and industrial experience, and it is for these end users to determine whether the products are suitable for their use. T&H cannot control the quality and condition of the substrate, nor the various factors affecting the use of the product. Therefore, T&H accepts no liability for any loss, injury or damage arising from the use of our products or from reliance on this product data sheet (unless otherwise agreed in writing). Data in this product data sheet may be revised as necessary based on practical experience and continued product development.

Information is subject to the manufacturer's latest version; the manufacturer's latest TDS prevails.
The technical parameters on this page are taken from the product's original manufacturer technical datasheet, the copyright of which belongs to the manufacturer. If a rights holder considers the presentation inappropriate, contact us for verification and handling.