ZIES219 Waterborne Inorganic Zinc-rich Shop Primer is a zinc-rich primer in the waterborne system. A shop primer providing short- to medium-term protection for blast-cleaned steel plates or other steel structures during storage, construction and assembly, specially designed for automatic spray lines. Excellent weldability and fast cutting performance. Parameters on this page: dry film thickness 15–20 µm, theoretical spreading rate 13.69 m²/kg, number of components two.
Source: OSAKA original technical data sheet (TDS) "ZIES219 Waterborne Inorganic Zinc-rich Shop Primer"; spreading rate and other values are converted from TDS parameters and are for selection reference only.
The above content is compiled from the manufacturer's datasheet and this site's parameter tables. For selection, coating systems and lead times, pleaseContact Usfor confirmation.
This page carries the full TDS for this product, translated from the manufacturer's original document. No file download is needed; for an original-language copy, send an enquiry.
| Volume Solids | 63% |
|---|---|
| Dry Film Thickness | 15–20 µm |
| Theoretical Spreading Rate | 13.69 m²/kg |
| VOC | — |
| Density / Specific Gravity | 2.30 kg/L |
| Number of Components | Two-component |
| Thinner | Clean fresh water |
| Mixing Ratio | Component A : Component B = 2:3 (by weight) |
| Colour / Appearance | Grey |
A two-component water-borne inorganic zinc-rich primer, with inorganic silicate emulsion as the film former and zinc dust as the anticorrosive pigment. The film has long-lasting weathering resistance, high water and salt water resistance, resistance to immersion in various oils, and strong resistance to various solvents. Heat resistance up to 400 °C. Excellent weldability and fast cutting performance.
A shop primer providing short- to medium-term protection for blast-cleaned steel plates or other steel structures during storage, construction and assembly, designed specifically for automatic spray lines.
| Colour | Grey |
|---|---|
| Volume Solids | 63% |
| Typical dry film thickness | 15–20 µm |
| Theoretical Spreading Rate | 13.69 m²/kg, based on 20 µm dry film thickness. |
| Practical Spreading Rate | Allowing a suitable loss |
| Mixing | While stirring, add the zinc dust to Component A until mixed uniformly. |
|---|---|
| Mixing Ratio | Component A : Component B = 2:3 (by weight) |
| Airless spray | Recommended: tip size 0.43–0.53 mm; spray pressure ≥ 15.5 MPa |
| Conventional spray | Recommended: nozzle size 1.3–1.5 mm; output pressure 0.3–0.4 MPa |
| Brush | Recommended for touch-up or small-area application. Take care to achieve the specified dry film thickness. |
| Roller application | Recommended for small-area application. Take care to achieve the specified dry film thickness. |
| Thinner | Clean fresh water |
| Paint equipment cleaner | Clean fresh water |
| Pot life | 23 °C: 8 h |
| Drying Time | |||
| Substrate Temperature | Touch dry (min) | Hard dry (h) | Minimum recoat interval (h) |
| 23°C | 3 | 4 | |
Note: ventilation, temperature, relative humidity and film thickness all affect drying and curing times. The data above are measured under well-ventilated conditions with relative humidity <75%.
| Storage | Store in a cool, dry environment |
|---|---|
| Shelf life | 1 year |
| Packaging Specifications | A: 20 kg in a 20 L container; B: 30 kg in a 20 L container |
| density | 2.30 kg/L |
All surfaces to be coated must be kept clean, dry and free of contamination. Before application, assess and prepare surfaces in accordance with ISO 8504:2000; remove oil and grease by solvent cleaning per SSPC-SP1; blast clean steel surfaces to Sa 2.5 or clean with power tools to St 3.
Subsequent coat: sealer, epoxy intermediate coat and others
Information is subject to the manufacturer's latest version; the manufacturer's latest TDS prevails.
The technical parameters on this page are taken from the product's original manufacturer technical datasheet, the copyright of which belongs to the manufacturer. If a rights holder considers the presentation inappropriate, contact us for verification and handling.
For more Q&A on selection, application, acceptance and defect diagnosis, seeFAQsection.
Packaging specifications and batch lead times are subject to actual availability. PleaseContact Uscontact us for project-based calculation.