E06-2 Inorganic Zinc Silicate Anti-rust Paint is an inorganic zinc silicate paint, used as a primer. Suitable for offshore platforms, dock steel piles, mine steel supports, bridges and large steel structures as a high-performance anti-rust paint. Parameters on this page: volume solids 49 ± 3%, dry film thickness 70 µm, theoretical spreading rate 295 g/m².
Data source: KAILIN original Technical Data Sheet (TDS), "E06-2 Inorganic Zinc Silicate Anti-rust Paint"; spreading rate and other values are converted from the TDS parameters, for selection reference only.
The above content is compiled from the manufacturer's datasheet and this site's parameter tables. For selection, coating systems and lead times, pleaseContact Usfor confirmation.
This page carries the full TDS for this product, translated from the manufacturer's original document. No file download is needed; for an original-language copy, send an enquiry.
| Volume Solids | 49 ± 3% |
|---|---|
| Dry Film Thickness | 70µm |
| Theoretical Spreading Rate | 295 g/m² |
| VOC | — |
| Density / Specific Gravity | — |
| Number of Components | — |
| Mixing Ratio | Component A : Component B = 4:1 (by weight) |
| Colour / Appearance | Grey matt |
| Drying Time | (25 °C) touch dry ≤ 1 h; hard dry ≤ 24 h |
Suitable for offshore platforms, dock steel piles, mine steel supports, bridges and large steel structures as a high-performance anti-rust paint.
| Appearance | Grey matt |
|---|---|
| Volume Solids | 49±3% |
| Dry Film Thickness | 70µm |
| Wet Film Thickness | 144µm |
| Theoretical quantity | Approx. 295 g/m² |
| Flash Point | Component A 13 °C; Component B 13 °C |
| Drying Time | (25 °C) touch dry ≤ 1 h; hard dry ≤ 24 h |
| Minimum overcoating interval | 8 h or more. Before painting, wipe the inorganic zinc-rich primer film surface with a cloth dipped in 107 thinner to confirm |
|---|
complete curing. If zinc powder dissolves on the cloth, the film has not fully cured and must continue drying; at relative
| humidity below 70% | water can be sprinkled on the film to promote curing; dry until the cloth is colourless (not dissolving), which |
|---|
indicates the film has fully cured, and then the next coat can be applied. Maximum overcoating interval unlimited, but before overcoating
zinc salts must be removed.
| Temperature | 5°C | 20°C | 30°C |
| Pot life | 24h | 12h | 6h |
| Shelf Life | 6 months |
|---|
MSDS).
| Ventilation volume | 1 kg paint or thinner |
|---|
| a. reach 10% of the lower explosion limit (LEL) | 54 m² |
|---|---|
| b. reach safety and health requirements (TLV) | 3815 m² |
| Thinner | a. reach 10% of the lower explosion limit (LEL) 210 m²; b. reach safety and health requirements (TLV) 14000 m² |
| Component A | 20 L drum, 20 kg |
|---|---|
| Component B | 10 L drum, 5 kg |
| Precautions | During application, keep stirring with a mixer to prevent zinc powder settling. |
The above product data is accumulated based on our laboratory and practical experience, but is for reference
guidance only. The substrate quality and pretreatment condition on site, as well as application conditions and many other factors, will affect product performance, which are not
within our control. Therefore, we will not be liable for any loss, injury or damage caused by using the information in this product data sheet.
Different application environments and changes in coating processes may result in failure to achieve the expected product performance.
Users should consult Kailin according to their own needs and specific applications for specific guidance on product suitability.
To comply with local laws and regulations, products may be adjusted appropriately; we reserve the right to modify the data sheet without further notice.
Information is subject to the manufacturer's latest version; the manufacturer's latest TDS prevails.
The technical parameters on this page are taken from the product's original manufacturer technical datasheet, the copyright of which belongs to the manufacturer. If a rights holder considers the presentation inappropriate, contact us for verification and handling.
For more Q&A on selection, application, acceptance and defect diagnosis, seeFAQsection.
Packaging specifications and batch lead times are subject to actual availability. PleaseContact Uscontact us for project-based calculation.